SMR Gearbox Set up

SMR Gearbox Installation
Satisfactory efficiency will depend on proper installation. lubrication and maintenance. as a result it is crucial the instructions within the set up and upkeep leaflet. supplied with every single gearbox. are followed very carefully. some of the essential aspects of belt and torque-arm installation are listed below.
one. Install pulley on gearbox input shaft as shut to your reducer attainable, and mount reducer on driven shaft as shut to bearing as useful. failure to do this will trigger excess loads while in the input shaft bearings and output bearings and could induce their premature failure.
two. Install motor and wedge belt drive using the belt pull at approximately 90° to the center line among driven and input shafts. this will permit tensioning in the wedge belt drive using the torque arm which should really preferably be in stress. if output hub runs anti-clockwise. torque arm really should be positioned the proper.
3. lnstall torque-arm fulcrum on the rigid support in order that the torque-arm will probably be at about ideal angles for the center line with the driven shaft and also the torque arm case bolt. ensure there is enough take up inside the turnbuckle for belt stress adjustment.
Preserve shut.
Bell drive may be situated in any hassle-free postion. in case the torque arm will be to be used to tighten the belts, the drive should be at about tight angle on the line amongst the input and output shafts.
Bell drive might be situated on the ideal if wanted.
If output hub rotates clock-wise. position belt drive and torque arm in opposite direction to that shown within the illustration.
Torque arm and belt take up.
Torque arm may be mounted to the correct if wanted.

TAGs:
en_USEN